South Street Lift Station and Force Main Replacement

New Caney South
Street Lift Station

Our Goal

LJA’s mission was to execute all appurtenances necessary to deliver a complete and operational lift station to New Caney Municipal Utility District. Our team provided project management, engineering, and design support services for this replacement project, including:
• Site work.
• Structural, mechanical, and electrical.
• Control components of the lift station.
• Fencing.
• Pavement.
• Gravity sanitary sewers.
• Force main.
• Manholes.

The LJA Roadmap

LJA’s public works team expertly executed the project roadmap.

The scope involved building a new lift station, 7,000 linear feet of sanitary sewer force main, and 1,000 linear feet of 18-inch sewer gravity lines. These infrastructure additions redirect flow to a large-diameter trunk sewer transmission line currently in the design phase, resulting in reduced strain on other parts of the collection system.

What We Offered

 

  • Boundary Survey
  • Record Drawings
  • Topographical Surveys
  • Geotechnical Investigation
  • Collection System Analysis
  • Construction Materials Testing
  • Project Representation Services
  • Design, Bidding, and Construction Phase Services

A Closer Look at the South Street Lift Station and Force Main Replacement