Building Routes to Connect
Our goal was to design and implement four direct connections between Grand Parkway (SH 99) and Hardy Toll Road to establish vital high-speed links for efficient urban connectivity. With precision and care, we preserved the environment, protected landmarks, and fostered connections, making roads that feel like home.
More Than a Roadway
In a mere eight months, LJA adjusted connectors to spare Dennis Johnson Park, managing design and engineering for four links between Hardy Toll Road and Grand Parkway/SH 99.
This crucial interchange amplifies SH 99’s connection via Hardy Toll Road, with careful attention to environmental impact and drainage issues.
The result? A thriving connection that’s more than a roadway — it’s a lifeline.
How We Helped
- Preliminary Engineering
- Planning
- Drainage
- Bridge Design
- Hydraulics Design
- Structural Design
- Construction Phase Services
Community Connection Through Design
For our LJA team, this project went beyond building roads; we built pathways for people to connect and be part of the community, preserving local treasures and minimizing environmental impact along the way.